5.3 Lean operations

The word “lean” means skinny or having no fat. Lean operations have no waste.

Taiichi Ohno described seven types of muda, or waste: (Womack and Jones, 309-310)

Gnanam cites Alukul for another waste: “not fully using people’s mental and creative skills.”

The framework of lean operations focuses on the concepts of value, value stream, flow, pull, and perfection (Womack and Jones, page 8) in order to reduce all of these types of waste.

Value is defined by the customer. An organization must have a clear definition of value as perceived by the customer. Time and money spent on features of a product or a service that the customer does not perceive have value are wasted time and money. Knowing what the customer values requires becoming close to the customer and constantly solicitly feedback.

In lean operations, a process flow diagram (which I discussed earlier) is called a value stream map. The diagram is similar, but the reason for creating the diagram is to identify

After those last activities are eliminated, the IE focuses on reducing the non value adding steps. The value stream mapping also identifies the time actually spent in adding value and time the product spends in storage or transport. Time in storage or transport is waste and should be eliminated.

Picture-Perfect Manufacturing, from MMS Online, describes how Stremel Manufacturing, in Minneapolis, Minnesota, used current state maps and future state maps to make sure that waste-reduction initiatives “improve the overall flow rather than merely optimize individual steps.”

In continuous flow, a product never waits but flows continuously through the manufacturing system, thus eliminating time in storage and in transport. Batches and queues should be eliminated. If products move through the production systems in batches, then the first item in a batch must wait until the last item in a batch is completed before it moves to the next processing time; batches mean product spends time waiting, and that time is waste. The presence of queues mean that a product was completed at a previous processing step before the next step was ready for more input. Since the final step of the production process is shipping the product to customers, product should be produced at the rate that meets the market demand. The principle can be applied in the production of services also.

One barrier to flow and one reason for using batches is the time necessary to switch the production facility from producing one kind of product to producing another. Setup Reduction: At the Heart of Lean Manufacturing, from MMS Online, describes how Richards Industries, a manufacturer of specialty valves in Cincinnati, Ohio, reduced its setup times from an average of 50 minutes to 27 minutes. This reduction enabled them to reduce the typical batch size from 200 to about 20 to 30.

Flow can be improved by eliminating bottlenecks as shown by the following example from World War II.

“An operations research worker during his first day of assignment to a new field command noticed that there was considerable delay caused by the soldiers having to wait in line to wash and rinse their mess kits after eating. There were four tubs, two for washing and two for rinsing. The operations research worker noticed that on the average it took three times as long for the soldier to wash his kit as it did for him to rinse it. He suggested that, instead of there being two tubs for washing and two for rinsing, there should be three tubs for washing and one for rinsing. This change was made, and the line of waiting soldiers did not merely diminish in size; on most days no waiting line ever formed” (page 3, Morse and Kimball)

A bottleneck is the narrowest part of a bottle and limits the flow in or out of the bottle. In the original situation with only two tubs for washing, the lines in front of those tubs would have been long, indicating that the wash tubs were the bottleneck, that is, the place in the production process with the least capacity. If washing took three minutes and rinsing took one minute, two wash tubs can serve 40 soldiers per hour while two rinse tubs can serve 120 soldiers per hour. With the new configuration, three wash tubs can serve 60 soldiers per hour, the same service rate as one rinse tub.

Bottlenecks can be identified by looking for places where WIP (Work in Progress) piles up and create queues. The processing rate at a bottleneck can be increased by reducing the time to process one item or by adding more processing capability. As a bottleneck’s rate is improved, WIP in front of the bottleneck will disappear, but another bottleneck may now appear.

Pull. In a lean system, no product or service is produced until a customer asks for it, that is, product is pulled not pushed through the system. Some product must be maintained in sales places to meet immediate demand, but reduction in lead time through improvements such as daily deliveries reduces the amount of stock kept on hand and allows more variety in stock.

Lean systems constantly seek perfection. An organization should not compete against its competitors. If benchmarking shows the company is doing better than its competitors, it should not relax. “To hell with your competitors; compete against perfection by identifying all activities that are muda and eliminating them” (Womack and Jones, page 40).

Lean operations use the following tools, in addition to the tools listed earlier:

Steelcase: Learning How to Implement Customer-Focused, Enterprise Wide Lean describes the improvements made in one company.

The Quality Training Portal has a lot more information about lean manufacturing at the web page What You Need to Know About Lean Manufacturing.